AC PowerFor Business-Critical Continuity™Liebert® FPC™ With VPMPUser Manual - 15 kVA -300kVA, 3 Phase, 50 & 60 Hz
Installation Instructions6Figure 3 Recommended minimum service and ventilation clearancesNOTE1. Service access is required at the front and rear. 2. S
Installation Instructions71.1.5 Floor Pedestal InstallationFloor pedestals are optional equipment that provide clearance for bottom cable entry or exi
Installation Instructions81.2 Additional Distribution Mounting and WiringFor Liebert® FPC™s with more than four panelboards, the additional panelboard
Installation Instructions91.3 Power and Control WiringPower and control wiring should be installed by licensed electricians. All power and control wir
Installation Instructions10Figure 5 Electrical connection location for 23" (584mm) cabinetFigure 6 Electrical connection location for 47" (1
Installation Instructions11Figure 7 Electrical connection location for 47" cabinet with Square D I-Line panelboard Front ViewWithout Doorsand Acc
Installation Instructions12Table 4 Suggested minimum input wire size datakVAInputVoltageUnits with Transformers Transformerless UnitsInputFLAInputOPDS
Installation Instructions13150208 427 600 (2) 350 kcmil * 416 600 (2) 350 kcmil *240 370 500 (2) 250 kcmil * - - -380 234 300 350 kcmil 228 300 350 kc
Installation Instructions141.3.2 Junction Box InstallationMain input (power) and low-voltage (control) junction boxes are available for the Liebert® F
Installation Instructions15Figure 8 Low-voltage control junction box connections, typicalFigure 9 Main input junction box connections, typical1.3.3 Sy
Installation Instructions16Equipment GroundingEquipment grounding is primarily for safety. Correct implementation of grounding also enhances equipment
Installation Instructions17Recommended methods for running the grounding electrode conductor (arranged by preference for system performance; as accept
Installation Instructions181.3.5 Output Power ConnectionsOutput circuit breaker(s) and/or panelboards with ground and neutral provisions are provided
Installation Instructions19Figure 11 Typical Liebert® FPC™ equipment arrangementLiebert FPCRemote Emergency Power Off Switch (REPO)Ground electrode c
Installation Instructions201.3.6 Control Wiring ConnectionsLiebert® power conditioning systems have provisions for external shutdown control from Remo
Installation Instructions21Figure 13 Typical low-voltage junction box (if used) control wiring for units without monitoring212019181716151413121110987
Installation Instructions22Figure 14 Typical low-voltage junction box (if used) control wiring for units with monitoring212019181716151413121110987654
Installation Instructions23Figure 15 Control wiring for units without low-voltage control boxBuilding Interface RelayRemove jumperwhen 5th customerala
Installation Instructions241.3.7 Adapter BoardThe Adapter Board (AB) provides customer interface to the Liebert® FPC™ monitoring systems for units wit
Equipment Inspection and Startup252.0 EQUIPMENT INSPECTION AND STARTUP2.1 Internal InspectionA detailed internal inspection should be performed after
iTABLE OF CONTENTS1.0 INSTALLATION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.1 Unpa
Equipment Inspection and Startup26Table 11 Torque specifications, generalElectrical connectionswith 1 Belleville washerElectrical connectionswith 2 Be
Inspection and Startup Checklist273.0 INSPECTION AND STARTUP CHECKLIST3.1 Inspection ___ 1. Confirm that the exterior of unit is undamaged (including
Inspection and Startup Checklist28___ 4. Check and record the input voltages at the junction box:Volts, Phase A to Phase B = ______________Volts, Phas
Inspection and Startup Checklist293.3 Monitoring System Checklist Basic Indicators___ 1. Turn On the building power to the unit, then turn the main in
Inspection and Startup Checklist303.4 Equipment Connection Check-Out of Units With Distribution Cables___ 1. Turn on main input power to the unit, the
Operating Instructions314.0 OPERATING INSTRUCTIONS4.1 Startup Procedures Before the unit is placed into service after initial installation, after equi
Operating Instructions324.2 Basic Monitor PanelBasic Monitoring provides transformer overtemperature alarm, transformer overtemperature shutdown and E
Operating Instructions334.3 Power Monitor PanelLiebert Power Monitor Panel with Velocity protocol (VPMP) provides input voltage, output current and vo
Operating Instructions34The VPMP detects and annunciates by alarm message the following conditions:• Output Overvoltage• Output Undervoltage• Output O
Operating Instructions354.4 Liebert Current Plus Monitoring (If Supplied)Liebert Current Plus Monitoring (Liebert CPM) provides the current and voltag
iiFIGURESFigure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVA . . . . . . . . 3Figure 2 Typical cabinet
Operating Instructions36The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun
Operating Instructions374.5 Liebert Distribution Monitoring (If Supplied)The Liebert Distribution Monitoring (Liebert LDMF) provides the current and v
Operating Instructions38The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun
Maintenance395.0 MAINTENANCE5.1 RepairEven the most reliable equipment may fail. Liebert Services is at your service to assure fast repair of your uni
Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i
1IMPORTANT SAFETY INSTRUCTIONSELECTROMAGNETIC COMPATIBILITY—The Liebert FPC complies with the limits for a Class A digital device, pursuant to Part 15
Installation Instructions21.0 INSTALLATION INSTRUCTIONS1.1 Unpacking and Installation1.1.1 Unpacking and Preliminary InspectionA quality installation
Installation Instructions3Figure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVATable 1 23-inch cabinet weig
Installation Instructions4Figure 2 Typical cabinet and floor planning dimension data, 47" (1194mm) cabinet 50-300kVATable 2 47-inch cabinet weigh
Installation Instructions51.1.3 Unit PreparationThe Liebert® FPC™ may be easily removed from the shipping pallet and installed by customer personnel.
Komentáře k této Příručce