Europe, Middle East, and Africa Document Only
Verify the absence of pressure between inlet and
outlet valves
Slam shut valve plug•
Closed -
PRX Pilot (
• A)
Unloaded
-
Slam Shut Setpoint Verication
Disconnect the BMS impulse, inject a pressure to the BMS
equal to the pressure required for the regulator
B20
Triggered position
Stage 1
Stages 2 and 3
1•
st
release relay stage
Set (Stage 1) -
Slam shut valve plug
•
Open (Stages 2 & 3) -
Progressively increase the BMS pressure to reach
-
tripping
Adjust setting if necessary (NTAOS2)
-
Note the set point value on the equipment or mark it
on a commissioning document
Positions before Startup
Slam shut valve plug•
Closed -
Servicing valve
•
Closed -
The equipment is ready for Startup
Startup (Act slowly)
Inlet valve•
Open - very slowly
1
•
st
release relay stage
Set (Stage 1)
-
Slam shut valve plug
•
Bypass (Stage 2) -
Adjust PRX setting to increase outlet pressure if
-
necessary
Open (Stage 3)
-
Servicing valve
•
Open slightly -
PRX Pilot (
• A)
Adjust setting to outlet pressure required
-
Outlet valve
•
Open slowly -
Servicing valve
•
Closed -
The equipment is started
It is recommended to seal the release relay
MAINTENANCE
Operations concerning the integral slam shut version are
in italic.
Servicing Check (Figure 12)
Recommended frequency:
Twice yearly minimum•
Verication:
Set point verication•
Regulator valve plug tightness•
Tripping and set point value•
Slam shut valve tightness•
Departure positions
Inlet valve • a Open
Outlet valve • a Open
Slam shut valve plug • a Open
Regulator• a In operation
Inlet and outlet sides of regulator are under pressure
Tightshutoffverication(and tripping verication for inte-
gral slam shut versions)
Inlet valve • a Closed
Outlet valve • a Closed
Regulator Observe the evolution of the outlet •
pressure (control regulator tightness)
Filterverication
Purge the lter (• C)
Verify the felt•