Emerson Avocent Universal Management Gateway Uživatelská příručka Strana 19

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 146
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 18
Installation.....13
2. Use a UTP crossover cable to connect the devices to the appliance, using an adaptor, if
necessary.
NOTE: To comply with EMC requirements, use shielded cables for all port connections.
WARNING: Do not turn on the power on the connected devices until after the appliance is turned on.
To daisy chain PDUs to the appliance:
NOTE: This procedure assumes you have one PDU connected to a port on the appliance.
1. Connect one end of a UTP cable with RJ-45 connectors to the OUT port of the connected
PDU.
2. Connect the other end of the cable to the IN port of the chained PDU. Repeat both steps until
you have connected the desired number of PDUs.
NOTE: For performance reasons,do not connect more than 128 outlets per serial port.
See Port configuration on page 50 for more information on how to set up serial targets.
KVM
If your appliance supports KVM connections, use a UTP cable and a UMIQmodule to connect a
KVMtarget to an autosensing port on the appliance.
Zobrazit stránku 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 145 146

Komentáře k této Příručce

Žádné komentáře