Emerson E2 Návod k obsluze Strana 9

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 71
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 8
9
designed for commercial HVAC and Refrigeration
applications. RS-485 hardware connections are used
at the network terminations and at each node
(compressor).
The Intelligent Store™ Discus® communication cable
terminates in the E2 Controller on the Network
Interface Board, and is routed to each of the
compressors in a daisy-chain format. Refer to figure
2.6 and figure 2.8.
Figure 2.6 RS-485 Daisy-Chain Configuration
One E2 controller can control two racks. Two RS485
connections are available on the Network Interface
Board for two parallel daisy-chain arrangements.
Refer to figure 2.7 for a photo of the Intelligent Store™
Discus® Network Interface Board.
Figure 2.7 Intelligent Store™ Discus® Network
Interface Board
Figure 2.8 Two Rack Daisy-Chain
One E2 controller can control 4 suction groups, with
up to 16 stages in each suction group. A compressor
with no unloader is one stage. A compressor with an
unloader would be counted as two stages.
2.5 Network Terminations and Cable
Routing
Each network node has 3 jumpers that must be
positioned to define whether or not the node is in the
middle or end of the daisy-chain. The last compressor
in the daisy-chain is “terminated” and the jumpers
must be set accordingly. The E2 jumpers on the
Network Interface Board are always set for “terminat-
ed” (refer to figure 2.11).
Refer to figure 2.10 for the location of the communi-
cations board in the Intelligent Store™ Discus® mod-
ule.
The communications wire to the compressor may be
routed through the rear of the side box (2D / 3D) or
through the rear of the terminal box in the 4D
compressor. Routing slots are also available on the
bottom of the front box. Consider protection of the
wiring from accidental pull-out when selecting the
routing option. From this perspective, using the
bottom of the front box may be an undesirable option.
If the bottom of the front box is used, a strain relief is
available and should be used as shown in figure 2.9.
Figure 2.9 Strain Relief for Communication Cable -
Alternate Routing
AE8-1337 R1
Zobrazit stránku 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 70 71

Komentáře k této Příručce

Žádné komentáře